Verify Heater Manufacturer China_Factory Audit Checklist_BANBEKE

2026-10-21

Introduction

Distinguishing real manufacturers from traders—and capable ones from risky ones—requires systematic verification.

---

Factory Audit Checklist

Production Capability

| Item | What to Check |

|------|---------------|

| Equipment | Tube rolling/welding machines, filling stations, test benches |

| Materials | Traceable material stock, grade certificates |

| Process control | In-process inspection points, travelers/routers |

| Test lab | Meggers, hipot testers, ovens, spectrometer |

Quality System

· ISO 9001 certificate (verify number with registrar)

· Incoming material inspection records

· Test reports for recent shipments

· Calibration records for test equipment

Red Flags

· Refuses unannounced video call → likely trading company

· No test equipment visible → no quality control

· Quotes far below all others → material substitution risk

· No material certificates → cannot verify alloys

· Payment to personal account → scam risk

Sample Verification Steps

1. Resistance test vs. calculated R = U²/P

2. Insulation ≥50MΩ at 500V

3. Dimensional check of critical features

4. Surface finish and weld quality

5. Weight check (reveals material thickness shortcuts)

---

Conclusion

Thirty minutes of structured verification prevents costly sourcing mistakes.

**BANBEKE** welcomes factory audits and provides complete verification documentation.

**BANBEKE Industrial Heaters**

· Website: senxte.com



share