Preventive Maintenance Checklist_Heating System Inspection_BANBEKE

2026-10-22

Introduction

Ready-to-use checklists transform maintenance policy into daily practice. Adapt these forms to your equipment and post them at the machine.

---

Daily Inspection Form

Equipment ID: __________  Date: ______  Shift: _____

Operator: _______________

□ Heaters: no smoke/odor/glowing/exposed wire     Pass/Fail

□ Displays: all zones normal reading              Pass/Fail

□ Setpoints: match process card                   Pass/Fail

□ Spot temps (IR): T1___ T2___ T3___ (dev <10°C)  Pass/Fail

□ Currents: A___ B___ C___ (within rating)        Pass/Fail

Abnormalities: _______________________________

Action taken: ________________________________

Weekly Inspection Form

□ Terminal tightness (torque check)               Pass/Fail

□ Heater surface cleaning                         Pass/Fail

□ Junction box dust removal                       Pass/Fail

□ Wiring clear of hot surfaces                    Pass/Fail

□ Insulation covers intact                        Pass/Fail

Findings: ___________________________________

Monthly Test Form

| Heater ID | Nominal Ω | Measured Ω | Insulation MΩ | Verdict | Action |

|-----------|-----------|------------|---------------|---------|--------|

| | | | | | |

Thermocouple check: TC1___ TC2___ (ref ___ )  Pass/Fail

SSR/contact inspection: ______________________  Pass/Fail

Quarterly Review Form

Heat-up time vs baseline: ________ (acceptable <+30%)

Three-phase unbalance: ________% (limit 10%)

Controller calibration error: ______°C (limit 2°C)

Ground resistance: ______Ω (limit 4Ω)

Spares stock check: __________________________

---

Conclusion

Consistent use of simple forms builds the data foundation for predictive maintenance.

**BANBEKE** provides editable checklist templates and can help structure inspection routes for your facility.

**BANBEKE Industrial Heaters**

· Website: senxte.com


share